Strip-out (Rückbau)
Also known as: Rückbau · reinstatement · make good · dismantling · removal of fixtures · Entkernung
A strip-out (Rückbau) is the dismantling of fixed installations such as kitchens, floor coverings, partition walls and built-in cupboards. In Swiss tenancies it is often contractually owed at the end of the lease when the tenant installed something themselves.
When a strip-out is owed
As a rule, the rented property must be returned in its contractual condition. Whatever the tenant installed themselves normally has to be removed and the original condition restored — unless the landlord takes the installation over.
If the landlord agreed to the alteration, there can even be a claim to compensation where the installation creates added value. That has to be clarified case by case and should be put in writing before anything is stripped out — once it is gone, the argument is much harder to make.
Typical strip-out work
In apartments: removing laminate or carpet laid over the original floor, dismantling self-installed cupboards, taking down partition walls, removing ceiling lights and panels, painting over strong wall colours, filling drill holes.
In commercial premises, additionally: removing lettering and signage, dismantling shop fittings, taking out cable and network installations, removing floor markings, unbolting shelving and filling the holes.
Separation is mandatory in a strip-out
Strip-out material is construction waste and has to be disposed of by fraction: mineral material, wood, metal, gypsum, plastic, insulation and any hazardous waste. A mixed strip-out skip is considerably more expensive and, at larger volumes, legally problematic as well.
A real example
A retail shop in Volketswil is being given up. The lease requires a strip-out back to shell condition. Removed are: shop fittings and shelving systems, a suspended ceiling section, the lighting installation, the vinyl floor, a partition wall to the storeroom and the exterior signage. The 340 anchor holes are filled. Disposal is separated into five fractions. Duration: five working days.
Services that cover this
Frequently asked questions about Strip-out (Rückbau)
Would you like a quote?
Free on-site assessment, a fixed price, and final cleaning with a handover guarantee (Abgabegarantie) — we stand behind the result at the official handover inspection.
Read the Google reviews: 4.8 out of 5 stars from 42 reviews4.8(42)